Smart fuel management for a self-sustained luxury island destination.
Project Overview
Sindalah Island, one of the flagship destinations of NEOM, is a high-profile luxury development located on the Red Sea. Operating entirely on off-grid generation, it requires an exceptionally reliable fuel management and power control system. IPU SA was selected to engineer and commission a fully redundant PLC-based fuel control system integrated with a custom SCADA platform to monitor, report, and manage power distribution across the island’s critical infrastructure.
Clients & Partners
-
Client: Integrated Engineering Contracting Co.
-
Location: Sindalah Island, Tabuk Province, Saudi Arabia
-
Completion: February 2023
-
End-User: NEOM
Products & Solutions Provided
-
Schneider Electric Programmable Logic Controllers (PLCs)
-
SCADA System for centralized monitoring and alerts
-
Fuel distribution and level management logic
-
Generator fuel supply control and failover programming
-
Field device integration and I/O mapping for remote diagnostics
-
Redundant architecture for critical applications
Technical Highlights
Component |
Description |
---|---|
Fuel System |
Full island power generation dependent on diesel supply |
Control Architecture |
Redundant PLC with watchdog and override protection |
SCADA |
Customized user interface for real-time fuel status, alarms, and event history |
Integration |
Field sensors, valves, and pumps connected via digital and analog I/O |
Reporting |
SCADA logging, fault alerts, and preventive maintenance tracking |
Challenges & IPU SA Solutions
Challenge |
IPU SA Solution |
---|---|
Zero tolerance for fuel-related power interruption |
Dual-controller redundancy with system watchdog |
Harsh environmental exposure |
IP-rated enclosures and marine-grade connectors |
Real-time visibility across multiple field components |
Custom SCADA with multi-tiered alert logic and HMI interface |
Key Outcome
-
Fully automated fuel control supporting uninterrupted power
-
Remote visibility and alert system to prevent manual monitoring
-
Reduced operator risk and improved maintenance scheduling
-
Island-wide power stability supporting high-end hospitality infrastructure
-
Delivered on schedule with FAT and SAT completed
Project Media