Project – Industrial Power Units for Industry, LLC | Saudi Arabia https://www.ipu-sa.com Powering Progress with Excellence Mon, 12 May 2025 23:50:17 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://www.ipu-sa.com/wp-content/uploads/2025/04/cropped-IPU-Site-Logo-scaled-2-32x32.png Project – Industrial Power Units for Industry, LLC | Saudi Arabia https://www.ipu-sa.com 32 32 Ma’aden Power Plant – MV Protection Relay Design and Commissioning https://www.ipu-sa.com/maaden-power-plant-mv-protection-relay-design-and-commissioning/ Tue, 01 Apr 2025 08:59:18 +0000 https://www.ipu-sa.com/?p=6451 ...]]>
Ma’aden Power Plant – MV Protection Relay Design & Commissioning

Industrial-grade protection for Saudi Arabia’s leading mining utility.

 

Project Overview
Ma’aden (Saudi Arabian Mining Company) is the Kingdom’s premier mining and minerals enterprise, operating complex power infrastructure at industrial scale. For its MV power generation and distribution systems, IPU SA delivered end-to-end electrical protection services — from design and relay setting to on-site testing and commissioning. The system ensures safe and reliable operation of generators, bus couplers, and feeders throughout Ma’aden’s energy network.

 

Clients & Partners

  • Client: Ma’aden

  • Location: Saudi Arabia

  • Completion: April 2025

  • Technology Partner: Arcteq

 

Products & Solutions Provided

  • Design and engineering of protection relay schemes

  • Supply of Arcteq MV protection relays

  • Setting configuration for overcurrent, earth fault, and feeder protection

  • Field wiring verification and logic testing

  • On-site Testing & Commissioning (T&C) of generator and feeder panels

  • Documentation and operator handover

 

Technical Highlights

Component

Description

Relay Brand

Arcteq (Finland) – MV generator and bus coupler protection

System Coverage

MV generators, bus-couplers, main and outgoing feeders

Settings

Time-current coordination and relay discrimination study

Verification

On-site testing and fault simulation during commissioning

Compliance

Designed to Ma’aden internal electrical safety standards

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Complex MV protection across interconnected assets

Relay coordination study and strategic zone setting

Need for high-speed fault clearing

Implemented optimized curve settings and backup zones

Tight timeline for commissioning window

Parallel design, testing, and field execution to compress schedule

 

Key Outcome

  • Full relay coverage for Ma’aden MV network

  • Improved fault isolation and system safety

  • Optimized generator and feeder protection logic

  • Reduced maintenance risks and improved compliance

  • On-time delivery with complete documentation and relay map

 

Project Media

]]>
6451
Central Utility Complex and Tunnels – Makkah Haram https://www.ipu-sa.com/central-utility-complex-and-tunnels-makkah-haram/ Wed, 01 Jan 2025 08:59:21 +0000 https://www.ipu-sa.com/?p=6309 ...]]>
Central Utility Complex & Tunnels – Makkah Haram

Redundant MV Control Systems for Critical Pilgrimage Infrastructure

 

Project Overview
The Pedestrian Tunnel Haram Project was developed to support millions of pilgrims by creating a safe, efficient, and fully powered underground passageway within the sacred Haram complex in Mecca. IPU SA was contracted to engineer and commission a comprehensive MV power control system to maintain uninterrupted energy across tunnel facilities, ensuring operational reliability during peak pilgrimage seasons.

 

Clients & Partners

  • Client: Abunayyan Trading Co.

  • Location: Mecca, Kingdom of Saudi Arabia

  • Completion: Q1 2025

  • Technology Partners: Schneider Electric, ComAp, GE

 

Products & Solutions Provided

  • MV Synchronization Control Systems

  • Supervisory Control & Data Acquisition (SCADA)

  • Programmable Logic Controllers – Schneider Hot-Standby PLC System

  • GE886 Protection Relays

  • Dual-Substation Generator Integration

  • Redundant Master Control Logic

  • Source Transfer System (STS) for voltage continuity

 

Technical Highlights

Component

Description

Generators

6 x MV generators (3 per substation)

Control System

Fully redundant SCADA + Master PLCs

Synchronization

Redundant sync logic with HMI interface

Protection

GE886 relays with isolation and fault protection

System Integration

Schneider MV switchgear + full ECU control

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Need for 100% power uptime during Hajj

Dual synchronized substations with real-time failover

Real-time load balancing across substations

Load sharing with automated sequencing logic

Safe and centralized control of remote assets

SCADA-driven monitoring with secure access layers

 

Key Outcome

  • Zero unplanned downtime across tunnel energy systems

  • Seamless backup generator coordination and switching

  • Fully redundant control and protection logic installed

  • Integrated HMI for local diagnostics and test modes

  • IEC-compliant commissioning and documentation delivered

 

Project Media

]]>
6309
King Salman Park – TSE and HVAC Control Systems https://www.ipu-sa.com/king-salman-park-tse-and-hvac-control-systems/ Thu, 01 Aug 2024 08:59:57 +0000 https://www.ipu-sa.com/?p=6330 ...]]>
King Salman Park – TSE & HVAC Control Systems

Powering environmental infrastructure in the world’s largest urban park.

 

Project Overview
King Salman Park is one of Riyadh’s flagship Vision 2030 projects — set to become the world’s largest urban park. As part of two separate packages within the development, IPU SA was contracted to supply intelligent Motor Control Centers (MCCs) and custom HVAC control panels for both Treated Sewage Effluent (TSE) Package 3 and Buildings A & B of the park’s Phase I development.

 

Clients & Partners

  • Clients: WETICO, Energy Concept

  • Location: Riyadh, Saudi Arabia

  • Completion: Q4 2024

  • Technology Partners: Siemens, Schneider Electric

 

Products & Solutions Provided

TSE Package 3:

  • Motor Control Centers (MCCs)

  • Siemens PLCs with HMI

  • Skid-mounted containerized control units

Buildings A & B:

  • AHU & Fan Control Panels

  • Schneider VFDs

  • DOL starters with remote monitoring

  • Building-integrated HVAC automation

 

Technical Highlights

Component

Description

TSE System

30,000 m³/day capacity with packaged MCC units

PLC

Siemens PLC with HMI for TSE process visualization

HVAC Panels

Supplied and commissioned for air handling units in two major park buildings

Drives

Schneider VFDs for fan and pump efficiency

Installation

Containerized MCCs and building-mounted panel layouts

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Rapid deployment required for phased park infrastructure

Pre-fabricated, containerized MCCs

Multi-vendor coordination across large site

Modular panel systems and flexible integration logic

High HVAC load diversity across buildings

Customized control panels with VFDs and expansion options

 

Key Outcome

  • Seamless control of TSE infrastructure and HVAC distribution

  • Improved energy efficiency and operational responsiveness

  • Scalable control logic for future expansions

  • Fully commissioned on-time with operator interface support

  • Environmentally aligned with Vision 2030 sustainability goals

 

Project Media

]]>
6330
NEOM Construction Village – MV Synchronization and Solar Control System https://www.ipu-sa.com/neom-construction-village-mv-synchronization-and-solar-control-system/ Mon, 01 Jan 2024 08:59:10 +0000 https://www.ipu-sa.com/?p=6475 ...]]>
NEOM Construction Village – MV Synchronization & Solar Control System

Hybrid power for Saudi Arabia’s largest workforce infrastructure.

 

Project Overview
As part of the early-phase development of NEOM, the 5K and 10K Construction Villages serve as the first operational hubs for housing and supporting the labor force that will build the city of the future. IPU SA was selected to engineer, supply, and commission an integrated MV Synchronization Control System and Solar Control System that collectively manage 14 MV generators, 3 bus couplers, and nearly 3 MVA of solar power across both sites.

 

Clients & Partners

  • Client: NESMA

  • Location: NEOM, Saudi Arabia

  • Completion: January 2024

  • Technology Partner: ComAp

 

Products & Solutions Provided

Automation & Control:

  • MV Synchronization Control Panels

  • ComAp InteliNeo 6000 Controllers

  • Generator and bus coupler load management

  • Real-time SCADA integration

Renewable Energy Integration:

  • Solar Control Panel Systems

  • Hybrid logic for generator + solar load optimization

  • PV monitoring, isolation, and failover systems

 

Technical Highlights

Component

Description

Generators

14 MV gensets coordinated with 3 bus couplers

Solar System

Nearly 3 MVA of PV power integrated into hybrid controller

Controllers

ComAp InteliNeo with SCADA-based logic

Hybrid Logic

Load-sharing between solar and diesel to reduce fuel costs

Monitoring

Web-based and local SCADA visualization with alarm management

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Coordination between renewable and diesel systems

Delivered intelligent hybrid logic with PV prioritization

Massive generator network requiring redundancy

Deployed a fully redundant sync system with backup controllers

Fast-paced timeline for NEOM operational readiness

Parallel design + build execution with phased commissioning

 

Key Outcome

  • Seamless hybrid power control across 2 construction villages

  • Fuel savings through optimized PV integration

  • Real-time visibility and diagnostics across generator fleet

  • Aligned with NEOM’s sustainability and digitalization standards

  • Delivered ahead of milestone deadlines

 

Project Media

]]>
6475
Al Rajhi Bank – ATS, MDB, and DC System Integration https://www.ipu-sa.com/al-rajhi-bank-ats-mdb-and-dc-system-integration/ Sun, 01 Oct 2023 08:59:47 +0000 https://www.ipu-sa.com/?p=6504 ...]]>
Al Rajhi Bank – ATS, MDB, and DC System Integration

Secure power infrastructure for one of the world’s largest Islamic banks.

 

Project Overview
Al Rajhi Bank, a major force in Saudi Arabia’s financial sector, required a robust and uninterrupted power distribution system to support its growing operational footprint. IPU SA was contracted to supply, install, and test an integrated power system consisting of Automatic Transfer Switches (ATS), Main Distribution Boards (MDBs), and a DC system — designed to support continuous banking operations and IT infrastructure.

 

Clients & Partners

  • Client: Global Infrastructure Modules

  • Location: Riyadh, Saudi Arabia

  • Completion: October 2023

  • End-User: Al Rajhi Bank

 

Products & Solutions Provided

  • ATS Panels for automatic source switching

  • LV Main Distribution Boards (MDBs)

  • DC Backup Power System for sensitive IT equipment

  • Protection and metering integration

  • Installation, testing, and handover documentation

 

Technical Highlights

Component

Description

ATS Panels

Automatic source selection between utility and generator

MDBs

LV boards with segregated loads and surge protection

DC System

Supports uninterrupted power for data and security layers

Wiring

Professionally labeled and routed for fast maintenance

Monitoring

Optional remote diagnostics integrated via Modbus

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

High sensitivity to downtime in banking operations

Redundant source switching and controlled ATS delay logic

Compliance with banking security & electrical audit standards

Delivered IEC 61439-certified equipment with full documentation

Limited space for board layout

Custom compact MDB design with bottom-entry cabling

 

Key Outcome

  • Reliable dual-source power with automated failover

  • Full support for security and financial data operations

  • Compact, organized power room layout

  • Reduced maintenance time through labeled design and digital wiring maps

  • Delivered within timeline and aligned with Al Rajhi’s audit standards

 

Project Media

]]>
6504
NEOM Hospital – MV Synchronization Control System https://www.ipu-sa.com/neom-hospital-mv-synchronization-control-system/ Wed, 01 Mar 2023 08:59:47 +0000 https://www.ipu-sa.com/?p=6417 ...]]>
NEOM Hospital – MV Synchronization Control System

Smart energy control for the Kingdom’s most futuristic healthcare facility.

 

Project Overview
The NEOM Hospital represents a bold step in the future of healthcare in Saudi Arabia — integrating cutting-edge technology, sustainability, and patient-centered design. As part of this next-generation medical infrastructure, IPU SAdelivered a customized MV Synchronization Control System to manage power from 14 generators and 3 bus couplers, ensuring reliable and redundant electricity for the hospital’s operations.

 

Clients & Partners

  • Client: Double Vision

  • Location: NEOM, Saudi Arabia

  • Completion: March 2023

  • Technology Partner: ComAp

 

Products & Solutions Provided

  • MV Synchronization Control Panels

  • Standalone SCADA System for remote monitoring

  • ComAp InteliGen & InteliNeo 6000 controllers

  • Generator control, bus coupler logic, and protection relays

  • Load sharing, sequencing, and auto-transfer systems

 

Technical Highlights

Component

Description

Generators

14 MV generators coordinated with 3 bus couplers

Controllers

ComAp InteliNeo 6000 with load sharing logic

SCADA

Standalone interface for full system diagnostics

Design

Fully redundant with failover protection

Integration

Configured to meet NEOM’s future-readiness and quality benchmarks

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Large number of distributed MV generators

Designed and tested central control logic with high-speed synchronization

Strict reliability and performance criteria

Integrated top-tier ComAp controllers with intelligent sequencing

Social and technological commitment expectations

Delivered a future-proof solution fully aligned with NEOM’s sustainability and resilience goals

 

Key Outcome

  • Seamless synchronization of complex MV power system

  • Redundant control across all generators and bus couplers

  • Compliant with NEOM’s high-availability and ESG requirements

  • Optimized SCADA for maintenance and energy tracking

  • Delivered on time with fully documented commissioning

 

Project Media

]]>
6417
Sindalah Island – Fuel Control and SCADA System https://www.ipu-sa.com/sindalah-island-fuel-control-and-scada-system/ Wed, 01 Feb 2023 08:59:35 +0000 https://www.ipu-sa.com/?p=6516 ...]]>
Sindalah Island – Fuel Control & SCADA System

Smart fuel management for a self-sustained luxury island destination.

 

Project Overview
Sindalah Island, one of the flagship destinations of NEOM, is a high-profile luxury development located on the Red Sea. Operating entirely on off-grid generation, it requires an exceptionally reliable fuel management and power control system. IPU SA was selected to engineer and commission a fully redundant PLC-based fuel control system integrated with a custom SCADA platform to monitor, report, and manage power distribution across the island’s critical infrastructure.

 

Clients & Partners

  • Client: Integrated Engineering Contracting Co.

  • Location: Sindalah Island, Tabuk Province, Saudi Arabia

  • Completion: February 2023

  • End-User: NEOM

 

Products & Solutions Provided

  • Schneider Electric Programmable Logic Controllers (PLCs)

  • SCADA System for centralized monitoring and alerts

  • Fuel distribution and level management logic

  • Generator fuel supply control and failover programming

  • Field device integration and I/O mapping for remote diagnostics

  • Redundant architecture for critical applications

 

Technical Highlights

Component

Description

Fuel System

Full island power generation dependent on diesel supply

Control Architecture

Redundant PLC with watchdog and override protection

SCADA

Customized user interface for real-time fuel status, alarms, and event history

Integration

Field sensors, valves, and pumps connected via digital and analog I/O

Reporting

SCADA logging, fault alerts, and preventive maintenance tracking

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Zero tolerance for fuel-related power interruption

Dual-controller redundancy with system watchdog

Harsh environmental exposure

IP-rated enclosures and marine-grade connectors

Real-time visibility across multiple field components

Custom SCADA with multi-tiered alert logic and HMI interface

 

Key Outcome

  • Fully automated fuel control supporting uninterrupted power

  • Remote visibility and alert system to prevent manual monitoring

  • Reduced operator risk and improved maintenance scheduling

  • Island-wide power stability supporting high-end hospitality infrastructure

  • Delivered on schedule with FAT and SAT completed

 

Project Media

]]>
6516
Maraya, Ashar Valley – MV Synchronization and Reactor System https://www.ipu-sa.com/maraya-ashar-valley-mv-synchronization-and-reactor-system/ Thu, 01 Dec 2022 08:59:14 +0000 https://www.ipu-sa.com/?p=6435 ...]]>
Maraya, Ashar Valley – MV Synchronization & Reactor Control System

Powering the world’s largest mirrored structure with smart control and stability.

 

Project Overview
Maraya, located in AlUla’s Ashar Valley, is a globally recognized architectural marvel and the largest mirrored building in the world. As a high-profile venue for concerts, events, and cultural gatherings, uninterrupted power and electrical stability are mission-critical. IPU SA was contracted to engineer and commission a custom MV Synchronization Control System that also manages shunt reactor logic to mitigate high capacitive reactance caused by the site’s extensive cabling.

 

Clients & Partners

  • Client: NESMA & Partners

  • Location: AlUla, Saudi Arabia

  • Completion: December 2022

  • Technology Partners: Schneider Electric, ComAp

 

Products & Solutions Provided

  • MV Synchronization Control Panels

  • MV Generator Control Integration

  • Reactive Power Compensation Logic

  • ComAp-based control for shunt reactors

  • Load balancing and power quality stabilization

  • Local and remote HMI for real-time operations

 

Technical Highlights

Component

Description

Network Complexity

High-reactance due to long cable runs

Reactor Control

Intelligent management of shut reactors via PLC/SCADA logic

Power Coordination

Synchronization of MV generators for load distribution

Stability

Protection logic to prevent system failure under harmonic stress

Operator Interface

Real-time diagnostics via SCADA and touchscreen HMI

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Excessive capacitive reactance from large cable network

Installed and programmed shunt reactor control for compensation

Risk of generator capacitor failure under reactive loads

Dynamic logic to adjust for live harmonic and load shifts

High sensitivity to downtime during events

Redundant control and protection layers for guaranteed uptime

 

Key Outcome

  • Optimized generator performance through reactive power control

  • Enhanced system stability despite complex cabling layout

  • Zero performance degradation under full load conditions

  • Delivered system meets Maraya’s world-class infrastructure standards

  • Reduced operational risk for public events and exhibitions

 

]]>
6435
King Khaled International Airport – Harmonic Filtering System https://www.ipu-sa.com/king-khaled-international-airport-harmonic-filtering-system/ Tue, 01 Nov 2022 08:59:24 +0000 https://www.ipu-sa.com/?p=6356 ...]]>
King Khalid International Airport – Harmonic Filtering System

Power quality optimized for mission-critical airport operations.

 

Project Overview
At King Khalid International Airport (KKIA) in Riyadh, IPU SA was contracted to deliver a harmonic filtering solution to address significant electrical distortion issues caused by nonlinear loads. The airport was experiencing high third harmonic currents and overheating in the neutral conductors — posing a risk to critical systems. IPU SA deployed a Schneider Electric Active Harmonic Filter (AHF), fully tested and commissioned to meet IEEE 519 compliance standards.

 

Clients & Partners

  • Client: MERAS International Investment

  • Location: Riyadh, Saudi Arabia

  • Completion: 2024

  • Technology Partner: Schneider Electric

 

Products & Solutions Provided

  • Active Harmonic Filter (AHF) – Schneider Electric

  • On-site power quality analysis

  • Load monitoring and harmonic profile reporting

  • Installation, configuration, and commissioning of AHF

  • Compliance audit with IEEE 519 standard

 

Technical Highlights

Component

Description

Filter Type

Active Harmonic Filter (Schneider Electric)

Target Harmonic

3rd Harmonic – Neutral line distortion

Analysis

In-house PQ audit, THD analysis, waveform diagnostics

Regulatory Standard

IEEE 519-compliant post-installation

Thermal Risk

Resolved overheating of neutral conductor

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Excessive third harmonic current in critical circuits

Conducted detailed PQ analysis to determine source

Neutral overheating due to harmonic overload

Specified AHF with tailored filtering profile

Regulatory risk & safety exposure

Reduced TDD to acceptable levels under IEEE 519

 

Key Outcome

  • Third harmonic distortion eliminated from targeted circuits

  • Neutral overheating resolved without rewiring

  • Increased system reliability for sensitive equipment

  • Regulatory compliance and safety risks mitigated

  • Delivered with minimal operational disruption

 

Project Media

]]>
6356
Saudi Customs Office – Power Factor Correction System https://www.ipu-sa.com/saudi-customs-office-power-factor-correction-system/ Tue, 01 Mar 2022 08:59:47 +0000 https://www.ipu-sa.com/?p=6459 ...]]>
Saudi Customs Office – Power Factor Correction System

Improving energy efficiency in critical government infrastructure.

 

Project Overview
The Saudi Customs Office required a targeted electrical upgrade to improve power efficiency and eliminate reactive energy losses across its facility. IPU SA was selected to design, supply, test, and commission an Automatic Power Factor Correction (APFC) system using Schneider Electric components. The installation not only stabilized the facility’s power quality but also ensured compliance with utility efficiency standards and reduced penalty risk for low power factor.

 

Clients & Partners

  • Client: RAM International

  • Location: Saudi Arabia

  • Completion: March 2022

  • Technology Partner: Schneider Electric

 

Products & Solutions Provided

  • Schneider Electric Automatic Power Factor Corrector (APFC)

  • Real-time power factor monitoring and regulation

  • Capacitor banks with intelligent switching logic

  • Overcurrent and harmonic protection components

  • Installation, testing, and commissioning of complete PFC system

 

Technical Highlights

Component

Description

Power Factor Correction

Automatic, multi-step regulation with capacitor bank modules

Controller

Smart reactive energy controller with auto adjustment

Design

Sized per facility load study and reactive compensation need

Installation

Seamless integration into existing LV distribution system

Protection

Overload and harmonic-safe configuration for panel safety

 

Challenges & IPU SA Solutions

Challenge

IPU SA Solution

Low power factor triggering potential utility penalties

Installed APFC with dynamic step regulation

Risk of overheating from reactive power overload

Designed with current-limiting protection logic

Minimal shutdown time for implementation

Executed rapid retrofit and activation during low-load window

 

Key Outcome

  • Achieved power factor improvement to >0.98

  • Reduced utility penalty exposure and energy waste

  • Enhanced panel safety through reactive load balancing

  • Delivered within government operational standards

  • Schneider-certified system commissioned with full documentation

 

]]>
6459